# FORMAT VERSION 1.1 # SITE NAME Pipe Clay Lagoon East # SURVEY MARK SPM10911 # OBSERVERS IM PR JP # LATITUDE -42.981371747 # LONGITUDE 147.536259475 # EASTING 543722.874 # NORTHING 5241114.338 # HORIZONTAL DATUM GDA94 # UTM ZONE 55 # VERTICAL DATUM AHD # START DATE/TIME 2010/06/14 14:30 # END DATE/TIME 2010/06/14 15:30 # TIME ZONE HOURS 10 # TRUE BEARING TRANSECT DEGREES 303 # SURVEY METHOD Levelling # INSTRUMENT DESCRIPTION Leica NA720 # LEVEL MISCLOSURE MM 10 # CREATION DATE 2012/05/22 # # # COLUMN 1 Horizontal distance from survey mark (m) # COLUMN 2 Vertical height above datum (m) # COLUMN 3 how-to-use flag (2 = use columns 1 and 2 (i.e. a levelling # measurement), # 1 = use column 1 only (i.e. a tape measurement # or a comment) # 0 = don't use data(i.e. erroneous data)) # COLUMN 4 etc. any comments on this location (words separated by spaces; # if more than one word, all comment enclosed in quotes) # # The perceived high water mark is indicated as follows: # # 2 HWM # # 0.00 1.149 2 SPM10911 36.56 0.870 2 1 40.25 0.930 2 2 42.81 1.060 2 3 43.85 1.070 2 4 45.63 0.840 2 5 48.29 0.530 2 6 57.02 0.550 2 7 85.40 0.200 2 8